RCC framed structure with RC foundations conforming to BIS..
Anti-termite treatment will be provided as per BIS for the complete building. Walls will be constructed using brick/cement blocks set in cement mortar..
8” thick hollow block wall for the outer wall and 4” thick hollow block wall for the internal partition wall. .
Brick wall will be provided wherever plumbing lines are coming through.
All block work/ brick work edges are protected with GI strips and plastered.
Ceiling height will be maintained at 9'-4” clear
|
| |
| |
Internal walls will be finished with cement plaster and Wall putty (JK or equivalent) and OBD paint.
The toilet walls will be finished with imported ceramic tiles of colours and size as recommended by the Architect upto the false ceiling height. Trims and profiles in PVC will be used to protect the edges of the ceramic tile..
Kitchen and other areas will be finished with cement plaster and cement paint..
Wash area will be finished with ceramic tiles upto false ceiling height.
2' above the kitchen platform will be finished with glazed ceramic tiles of suitable size as specified by the architect. .
Exterior faces of the building including the balconies will be finished with cement plaster and emulsion paint Asian Paints (APEX) or equivalent.. |
| |
| |
Ceiling areas of living, dining & bedrooms will be finished with Cement plaster & Wall putty (JK or equivalent) and painted with oil bound distemper (OBD). Ceiling areas of kitchen & other areas will be finished with cement plaster and cement paint . Ceiling areas of toilets and wash area will be finished with grid false ceiling (2' x 2') due to core cutting plumbing systems.. |
| |
| |
Living & Dining will be finished with Marble Slabs and Bedrooms will be finished with RAK vitrified tiles or equivalent as prescribed by the Architect.
Kitchen, Utility, Balcony & Toilets will be finished with ceramic tiles of suitable size as recommended by the Architect. 3” high skirting matching the floor tile will be provided in the Kitchen & Balcony. . |
| |
| |
Staircase & lobbies will be finished with polished Granite tiles. Staircase walls will be finished with suitable ceramic tiles, as recommended by the Architect. Trims and profiles in PVC will be used to protect the edges of the ceramic tile..
Car parks will be finished with Granolithic flooring. Driveways will be finished with Cement tiles as recommended by the Architect. |
| |
| |
Entrance doors
Teak wood frame with 45mm thick Masonite Craft master shutter from 'Kuttys' polished with melamine on both sides. Godrej ultra lock or equivalent will be provided..
Bedroom doors
Chemically treated kiln seasoned Salwood frame, 30mm thick Masonite Craft master shutter from 'Kuttys' with Godrej cylindrical locks or equivalent and finished with enamel paint on both sides. .
Toilet doors
Chemically treated kiln seasoned Salwood frame, 30mm thick Masonite Craftmaster door, from 'Kuttys' with Godrej Cylindrical locks or equivalent, finished on both sides with enamel paint and plastic coated on one side. .
French Door & Windows
Powder coated Aluminium openable glazed windows will be provided in all rooms with insect shutter. Sliding Windows will be provided between the Kitchen and the Wash area, wherever required. . |
| |
| |
Counter top Platform dry fixing will be finished with 18mm thick granite slabs 2' wide at a height of 2' 9” from the floor level and provided with Carysil / Stainless Steel One and a half Bowl sink. Sink mixer will be provided.
Wash area will have Single bowl Carysil / Stainless steel sink and provision for fixing washing machine.
Provision for fixing an Exhaust fan, Ceiling fan, Microwave, Fridge, Mixer, Grinder, and Aqua guard will be made
.
|
| |
| |
All sanitary ware will be of Hindware / Parryware or equivalent make 'White' Color.
Wall mounted Constellation / Cascade closets or equivalent will be provided in all toilets.
All toilets will have the new range of Hindware/Parryware Wash basins as decided by Architect.
All CP fittings will be of Parryware “Spark” Single Lever Model or equivalent make.
Shower partitions using “Dorma” fittings or equivalent will be provided in Master and Children's Toilet.
Overhead shower with Divertor and Spout will be provided in all toilets.
All toilets will have provision for connecting a Geyser, Exhaust fan, Wall mounting fan, Electric Shaver, Hair Dryer.
|
| |
| |
Concealed PVC pipe wiring with multi stranded Fire Retardant Low Smoke (FRLS) copper conductor wires.
All apartments will have distribution boards with MCB.
All switches and sockets are of Crabtree or equivalent make.
|
| |
| Living |
3 |
2 |
3 |
1A/c |
| Dining |
3 |
2 |
1 |
1A/c |
| Pooja Room |
1 |
Nil |
1 |
Nil |
| Each Balcony |
1 |
1 |
1 |
Nil |
| Bedrooms |
3 |
1 |
4 |
1A/c |
| Master Bedroom |
3 |
2 |
4 |
1A/c |
| Each Toilet (including exhaust & wall mounting fan) |
2 |
2 |
2 |
1 |
| Kitchen |
3 |
2 (incl. Exhaust Fan) |
6 |
2 |
| Wash |
1 |
Nil |
1 |
1 |
|
| |
| TV and Telephone points will be provided in living and all bedrooms. |
| |
Each building will be served by a SIX passenger lift of KONE or equivalent make with Automatic Openable Doors. |
| |
| |
3 phase power supply with 100% auto generator back up for the apartment and common areas will be provided. |
| |
| |
| 5' high compound wall will be provided as specified by the Architect. |
| |
| |
The entire project will be magnificently landscaped.. |
| |
| |
Adequate Bore wells will be provided. .
Under ground RCC sump of adequate capacity with Hydro-pneumatic system for supplying water will be provided.
Reverse Osmosis Plant will be provided to meet the drinking water requirement.. |
| |
| |
A Sewerage treatment plant will be provided. Treated sewerage will be circulated as specified, where safe for use. |
| |
|
| |
| A professionally fitted Sports & Recreation Centre will be operational in the vicinity to provide sports and recreational activities. |
| |
|
| |
| Central Park projects will be monitored and maintained under a modern building management system |
| |