RCC framed structure with RC foundations conforming to BIS.

Anti-termite treatment will be provided as per BIS for the complete building. Walls will be constructed using brick/ cement blocks set in cement mortar.

All brick / block work edges are protected with GI strips and plastered.

Ceiling height will be maintained at 9'-4" clear.
 
 
Internal walls will be finished with cement plaster and wall putty (JK or equivalent) and Tractor emulsion or equivalent.

The toilet walls will be finished with glazed ceramic tiles subject to a limited choice of colors of suitable size upto the roof height. Trims and profiles in PVC will be used to protect the edge of the ceramic tile.

Wash area will be finished with ceramic tiles.

2' above the kitchen platform will be finished with glazed ceramic tiles as specified by the Architect.

Exterior faces of the building including the balconieswill be finished with the cement plaster and emulsion paint. - Asian paints (APEX) or equivalent.
 
 
Ceiling areas of living, dining, bedrooms, balconies and Kitchen will be finished with Cement plaster & painted with emulsion Tractor or equivalent. Ceiling areas of toilets will be finished with cement plaster and cement paint.
 
 
Living & Dining will be finished with Marble slabs and Bedrooms will be finished with Marble/ Granite tiles, as specified by the Architect.

Kitchen, Utility, Balconies & Toilets will be finished with ceramic tiles of suitable size with 4" high skirting using the same tiles matching the floor.
 
 
Staircase & lobbies will be finished with polished granite tiles. Staircase walls will be finished with glazed ceramic tiles, as per Architect's detail.

Car parks will be finished with Granolithic flooring. Driveways will be finished with Cement tiles as recommended by the Architect.
 
 
Entrance door
Teak wood frame with 45mm thick Masonite Craft master shutter from 'Kuttys' - polished with melamine on both sides. Godrej ultra lock will be provided.

Bedroom Doors
Teak wood frame with 30mm thick Masonite Craft master shutter from 'Kuttys' with Godrej cylindrical locks and finished with enamel paint on both sides.

Toilet Doors
Teak wood frame with 30mm thick Masonite Craftmaster doors from Kuttys' with Godrej Cylindrical locks or equivalent finished on both sides with enamel paint and Plastic coated on one side.

 
Windows
Powder coated Aluminium openable glazed windows will be provided in all rooms. Kitchen will have sliding windows.

Painted MS grills will be fixed on the inner side.
 
 
Counter top Platform will be finished with 20mm thick granite slabs 2' wide at a height of 2' 9" from the floor level and provided with Stainless Steel Double Bowl sink. Sink mixer will be provided. Wash area will have single bowl Stainless steel sink and provision for fixing washing machine.

Provision for fixing an Exhaust fan, Ceiling fan.Microwave, Fridge, Mixer, Grinder, Chimney and Aqua guard will be made.
 
 

All sanitary ware will be of Parryware / equivalent make - 'White' Color.

Wall mounted Cascade/equivalent closets will be provided in all toilets.

All toilets will have over counter Wash basin with granite counter top.All toilets will have provision for connecting a Geyser.

All CP fittings will be of "Jaquar" make Continental range or equivalent.Shower partitions using Dorma fittings or equivalent will be provided in Master and Children’s Toilet.

Wall mixer with an overhead shower will be provided in all toilets.

 
 
Bedrooms will be provided with a loft on one wall and space for wardrobes.
 
 
Concealed insulated copper multi-strand wires in all apartments.Each apartment will be provided with a distribution board having MCB's.All switches & sockets are of Crabtree / equivalent make.
 
Rooms Light Point Nos. Fan Point Nos. 5 amps Point Nos. 15/20 amps Point Nos.
Living 3 2 1 1A/c
Dining 3 2 1 1A/c
Pooja Room 1 Nil 1 Nil
Each Balcony 1 1 1 Nil
Bedrooms (including bedside light and stand light) 3 1 5 1A/c
Master Bedroom(including bedside light and stand light) 3 2 5 1A/c
Each Toilet (including exhaust & wall mounting fan) 2 2 3 1
Kitchen 3 2 (incl. Exhaust Fan) 6 2
Wash 1 1 1 1
 
TV and Telephone points will be provided in living and all bedrooms.
 
The building will be served by a SIX passenger lift from KONE or equivalent make with automatic doors.
 
 
3 phase power supply with 100% generator back up for the Apartment and the common area’s will be provided.
 
 
5' high compound wall will be provided.
 
 

Adequate landscaping will be provided as per architect's design.

 
 
Bore well will be provided.

One under ground RCC sump of adequate capacity for metro water, with Hydro-pneumatic system for supplying water will be provided.

Reverse Osmosis Plant will be provided to meet the drinking water requirement.
 
 
A swimming pool with a wading pool for children set in a landscaped surrounding.

A State-of-the-art Gymnasium, a table tennis room & a pool table will be provided.
 
 
 
  Maurya Enclave
Location Map
About the Developers
Ground Floor Plan
First & Second Floor Plan
Third Floor Plan
Fourth Floor Plan
Specifications
Apartment Selection Guide
Project Photographs

  Quick Links
Member Login
Completed Projects
On-Going Projects